Five elements are the key to success or failure of PVC plast

时间:2019-07-23 06:05:51 访问量:1621

There are five factors for the success or failure of a PVC plastic floor project: main materials, auxiliary materials, environmental temperature and humidity, grass-roots units, craftsmen (people). Any factor has problems, and the whole project has problems. The problem of this project is very big. There are five factors. Except for the main material, there are all problems. The whole project has been done in a mess, which can be regarded as the teaching material of negative cases.
 
 
Five elements are the key to success or failure of PVC plast
Five elements are the key to success or failure of PVC plastic floor project
 
 
 
1. Before construction, even before signing the contract, the "detection and evaluation" of the ground is very important. Including the analysis of the parameters of the floor, the estimation of temperature and humidity during construction, the performance of main and auxiliary materials, craftsmen's skills and so on, this work should be completed by the floor trader. Unfortunately, this work has not been done at all! Human factors, the project commander (floor trader) has problems.
 
 
 
2. The grass-roots level is extremely complex, and the old project transformation must be discussed one case at a time! __________. In the face of complex floors, ignore, weather factors can not be changed, the adhesive is optional. Old PVC floors, epoxy floors, the choice of adhesives and cement self-leveling base can be the same? There is no pre-inspection and evaluation of the grass-roots level, and there are problems at the grass-roots level.
 
 
 
3. The surface temperature of the construction environment should not be lower than 15 degrees according to the relevant German norms. The highest temperature on site is only 7.4 degrees Celsius, and it is colder at night. Problems have arisen in the construction environment.
 
 
 
4. Supplementary materials, as a supplier of auxiliary materials, are not as simple as selling products. When selling glue, do not ask the customer what the grass-roots situation is? What is the customer's use of temperature and humidity, sold with eyes closed? There is a problem with accessory materials.
 
 
 
5. There are problems in the selection of scraping teeth, the understanding of basic units and the recognition of adhesives in construction. Scraping teeth selected on site are totally unsuitable for PVC floor installation. Workers do not understand the differences in the choice of adhesives for various grass-roots units. The requirement for adhesives is not slightly higher when rubber flooring is laid on top of rubber flooring and epoxy flooring is laid on top of rubber flooring. Craftsmen, human factors have problems.
 
 
 
6. Do not know from that year, as long as there are problems in the installation, the first thought is that the floor has problems, the main material has problems! With the author's understanding of the floor, the main material of the scene did not find any problems.
 
 
 
Solution:
 
 
 
1. Warm up and turn on air conditioning. According to German norms, the temperature on site should not be less than 18 C. According to the author's experience, the lowest temperature should not be less than 15 C.
 
 
 
2. changing adhesive, such a complex base, the ordinary adhesive is definitely not enough. It is necessary to use the three component copolymer emulsion type water-based adhesive, such as terbon's T300, which is suitable for old PVC flooring and epoxy, and also applies to cement self leveling base.
 
 
 
 
 
Attention should be paid to the following drawings: drying time and construction time of adhesives:
 
Five elements are the key to success or failure of PVC plast
 
Five elements are the key to success or failure of PVC plastic floor project
 
 
 
Cement self-leveling absorbable ground, pasting time in the blue arc area of the figure above, old PVC coil floor and non-absorbable base such as epoxy resin, pasting time in the grey arrow area. The ordinary adhesive is invalid in the gray arrow area, and only three yuan copolymer emulsion adhesive can be used. The three component copolymer emulsion is extremely expensive, all imported from Germany.
 
 
 
Understanding technology is not the most terrible. The most terrible thing is that flooring merchants "think they understand" and "have been working for several years, it was no problem before". In particular, I think that "it's no problem to do that before". Little imagine, before no problem may be really no problem, may be no problem in the short term, may be the problem of the owner unit did not find the floor merchant just. Luck is always unreliable. Luck is always bad. When something goes wrong, the loss of RMB is the most effective education.

公司地址:

总部地址:上海市金山工业区金腾璐1106

华北分部:石家庄中冶国际广场

卡曼工厂:浙江嘉善姚庄工业区

华南分部:广州市佛山

展厅暨仓储中心:

联系电话:

全国统一服务热线:021-60500084

招商热线:张小姐  13795233793

郭先生  15821396693

大巨龙华东区:张女士13795233793

大巨龙华北区:张小姐13911243276

大巨龙华中区:郭先生13699142298

大巨龙华南区:张先生18513242555

大巨龙西北区:董先生18003317790

大巨龙西南区:王先生18612411131


Dajulong PVC flooring roll- the largest PVC floor coil manufacturer in China京ICP备12004606号-4 网站地图